PROJECTS
Not only do we help create business value in industries, but we also drive a technological innovation transformation, optimizing the business and operational processes of companies.













CHICHENITZA
The Haskell Company – P&G Naucalpan Plant
Year: 2011.
SERVICES
HVAC, process equipment, Low Voltage Power Distribution, Lighting, Grounding and Lightning Rods electrical installation for a new 3600 m2 toothpaste manufacturing building (DMHS)














AGAVE
The Haskell Company – Naucalpan Plant
Year: 2021.
SERVICES
Control system integration, control engineering, electrical installation, and start-up support for HVAC, BMS, CCTV and Control network for new 7200 m2 AGAVE pharmaceutical grade tableting building




MISSION CRITICAL
The Haskell Company – Queretaro.
Year: 2022.
SERVICES
Design review, workshop drawings, as-built drawings, electrical installation, commissioning and start-up for the electrical system of special HVAC, Voice, Data, Perimeter Security, BMS, EPMS and Access Control facilities for a new Data Center (AWS062).












CHRONOS
Procter&Gamble – Vallejo Plant
Year: 2019.
SERVICES
Instrumentation, control, communications electrical Installation and Start-up Support for a total modernization project of the electrical process and packaging system for Tower 2 for the manufacture of fabric care powdered soap.




SKYNET
Procter&Gamble – Vallejo Plant
Year: 2021.
SERVICES
Technical surveys, detailed engineering, instrumentation installations, Control, Communications and Technical Support for the migration of 252 Armorstar VFD units on the DeviceNet network to Armorstart VFD units on the Ethernet network for the FPHS finished product transportation system.












BACKBONE
Mondelez International – Ecatepec.
Year: 2018.
SERVICES
Design review, workshop drawings, as-built drawings, electrical installation, commissioning and start-up support of the electrical power system, control, instrumentation, and communication networks integration for a new building whey manufacturing process




HERRADURA
The Haskell Company – Jalisco.
Year: 2023.
SERVICES
Technical site surveys, detailed engineering and 3D model for electrical integration of instrumentation and communications system for the new Tequila production process building.










LBC
Henkel – Toluca Detergents Plant.
Year: 2021.
SERVICES
Technical site surveys, detailed engineering, new installation for instrumentation, Control and Communications, programming, start-up support for a new water well, including the storage and distribution system of process water in the fabric care liquid soap manufacturing building.




AWOA
P&G – Vallejo Plant.
Year: 2022.
SERVICES
Technical site surveys, detailed engineering, new installation for instrumentation, Control and Communications, programming and start-up support for the implementation project for a new water well, including the storage and distribution system of process water in the fabric care powdered soap manufacturing building.














CFE WWTP
CFE – Thermoelectric Power Plant of Salamanca Guanajuato – 2006.
CFE – Tula Hidalgo Thermoelectric Power Plant – 2009.
SERVICES
Detailed engineering, installation of Medium and Low Voltage Power, Instrumentation, Control and Communications, configuration, programming and commissioning for a New Wastewater Treatment Plant for recirculation of water to boilers.




CFE WWTP
CFE – Thermoelectric Power Plant of Salamanca Guanajuato – 2006.
CFE – Tula Hidalgo Thermoelectric Power Plant – 2009.
MILLENNIUM PACK CENTER
Procter&Gamble – Millennium Plant
Year: 2019.
SERVICES
Technical site surveys, detailed engineering, safety machine guarding manufacturing and installation, safety interlocks, emergency stop system, laser barriers, as well as control facilities, communications and start-up support for machine safety system project for 19 packing machines.












TDC MIGRATION
Procter&Gamble – Vallejo Plant
Year: 2020.
SERVICIES
Technical surveys, detailed engineering, instrumentation installations, Control, Communications and Technical Support for the migration of the TDC HONEYWELL system to the new ALLEN BRADLEY platform for Tower 2 for fabric care soap powder manufacturing.